The walls begin.


They first laid out the walls frames, cutting them to length. Here there is the top and bottom plate.



Within a couple of days they had all the wall frames up! It was amazing really.
This is the view of the back of the house. The corner is the laundry, then three bedrooms run across the back, the far end is our ensuite.




The front of the house had to be put up by using a crane as it is that heavy.
The top edge at the front there is 5. something metres high!




Our hallway, looking for our bedroom door down to the door that leads to outside.
The kids called it their raceway. The hallway is 17 metres long!



View from the front


Sunday, March 29, 2009

And then came the walls.....

Well nearly the walls. This is the bottom and top plate of the walls, the wall frame bits will go in the middle this week! THis is how they mark it and measure it out. Door ways will be cut in etc to the bottom plates. Windows have been marked and its action action action!









At the font of the house you will see some metal sticking straight up. That bit is actually the front of the house. It is five metres in height and 12 metres in length, so pretty weighty!
A crane is coming in very very soon to pull it upright for it to form the front for where the windows go. The whole front of the house is glass./windows.
Those bits sticking up will eventually have a shade on them to allow the winter sun in but keep out the summer sun....


We have a slab!!!!!!!!!

but it's not Coopers!














Saturday, March 7, 2009

Our bathroom products

Our spa! To be located in main bathroom.

I can't wait!




Our toilet! How exciting hey!
  • Close coupled toilet suite
  • Modern, sophisticated wall faced design (you always need a modern dumping spot)
  • Soft close seat for quiet operation (no more banging that seat down)
  • WELS 4 star water efficiency rating (yay for water saving)

The Electricity Trench

The trench has begun! The trench is around 300 metres long. It runs from the house site down to our shed. On the shed we have 32 solar panels installed, which are connected to the grid to sell our electricity = small or no electricity bills for us!




The trench runs across our winter creek. In this trench will be the electricity cables, telephone, network, pipe to pump rain water from shed water storage, pipe to pump dam water for use on our garden.




Here is the beast at work.....I mean the machine not the husband......rofl

Slab preparation begins!

The slab is getting ready! Plastic down and steel supports going in.




The centre support of the house has a 1.2 metre deep channel. This will be filled with cement.



It rained this week so the channels filled with water, turned out to be a good millipede trap :)

Saturday, February 21, 2009

Dolomite in and compacted!



They are getting very very close to putting the slab in YAY!

The top shot shows the first load of dolomite in and ready to spread, the final two shots are the dolomite in and spread and compacted.

We went yesterday and walked around our little bit of compacted dolomite and OMG it is HUGE!

I can't wait, I can't wait.............not long and we'll have a house :)

  © Blogger template 'Ladybird' by Ourblogtemplates.com 2008

Back to TOP