The photos will enlarge if you click on them.

Thursday, May 21, 2009

The walls begin.


They first laid out the walls frames, cutting them to length. Here there is the top and bottom plate.



Within a couple of days they had all the wall frames up! It was amazing really.
This is the view of the back of the house. The corner is the laundry, then three bedrooms run across the back, the far end is our ensuite.




The front of the house had to be put up by using a crane as it is that heavy.
The top edge at the front there is 5. something metres high!




Our hallway, looking for our bedroom door down to the door that leads to outside.
The kids called it their raceway. The hallway is 17 metres long!



View from the front


0 comments:

  © Blogger template 'Ladybird' by Ourblogtemplates.com 2008

Back to TOP