The photos will enlarge if you click on them.

Wednesday, October 28, 2009

More stuff!



First of all we have Hay and doesn't it look gorgeous









Kitchen with range hood almost finished, just needs to be wired up and the stainless steel covers put in place.




Dining room cupboard/storage.


                                              





Pantry now with shelves!




Deep pot drawer in the kitchen.  Base extends down into kick-board area so there is
heaps of rooms for large pots.





Utensil drawer, there are three of these and each is around 100cm wide.





Laundry now with bench tops (very dusty bench tops!)





Laundry cupboard, no handles as it has touch catches.





The pile of tiles for wet areas.





Shower drain chanel have been cut out.  We are having those long grate type drains instead of just
a little round hole.





The spa was installed today up on a cement block.  Now the tiler has to come in and do his magic which will take around 3 weeks.








 
The desk has been installed in the study too.

0 comments:

  © Blogger template 'Ladybird' by Ourblogtemplates.com 2008

Back to TOP