Cladding is go!


They have started cladding the house :) It is clad in 'Colourbond - Surfmist'
It is very exciting, we can now stand in the house out of the breeze!
They should have the cladding finished within the next day or two, then the first fix electrical starts.
They have also finished the limstone walls inside, will post pictures of them later on :)






The study and our bedroom both have verandahs on the front now. The verandahs are angled to allow the winter sun in but will exclude the summer sun and make sure that it does not drop down right outside the window, keeping the house cooler.


The back of the house. To the left is our ensuite bathroom, then our WIR that is almost a bedroom in itself LOL, then the kids 3 bedrooms, the main bathroom then laundry.









